The main park features a capability of 200 MW although Sandrini II provides a capability of a hundred MW. The total cost of both jobs were not disclosed nevertheless, all through construction, around two hundred employees were being employed. The jobs are expected to discover a handful of positions opening https://sites.google.com/view/best-solar-company-california/