Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production criteria. The contract included the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://bookmark-template.com/story26527629/penmann-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme